Our Products

Tektronix 013-0103-00 Long Lead FET Adapter

In Stock: 1

Price: $100.00

Qty: 

ships immediately

The Tektronix 013-0103-00 is a Long Lead FET Adapter.  The 013-0103-00 works with the 576 and 577 curve tracers.